MM00EI38 Major Project 3 (5 cr)
Prerequisites Not applicable
Objectives I develop skills that are essential from the perspective of my major.
I assess my competence, strengths and areas for development and consider my professional orientation.
I plan and implement my activities in such a way that I can reach my goals within a limited time.
In collaborative projects: I understand the nature of teamwork and know how to take others into account in project work.
Content The content of the project, which can take into account the student's special development targets, strengths or professional interests, is agreed on a student-specific basis. The project can be related to e.g. thesis or support other demonstration of competence. The output of the project must be realised in a concrete way, such as a public event, recording, sheet music or other document.
An instrument pedagogue's project can be related to e.g. selected technical, musical or expressive development target and/or performance or practice skills and support preparation for demonstrating instrumental competence.
For a student majoring in theory, the project can be an applied music theory project. It can be, for example: a composition project that is realised as a concert and by means of analysis as a written output.
The project of a student majoring in music technology can be an applied music technology project.
Recommended optional programme components If necessary, the student advisor will recommend optional programme components for each student based on their individual study plan.
Accomplishment methods Not applicable
Execution methods Not applicable
Materials Not applicable
Literature Not applicable
Evaluation Criteria Approved/Failed
Evaluation Criteria

pass/fail
Project planning and implementation as agreed.
Active participation in the implementation of the project.
Collaborative project: I participate as an active member of the team in the planning and implementation of the project.