Curricula

Curriculum Table
Competences
Assessment Framework
General Information

Description


TS00BN40 BIM Utilization in Building Production (5 cr)
Prerequisites Cost Controlling and Monitoring in Building Process
Objectives Student s know basics of building modelling an potential utilization of BIM in cost calculation and in production planning. Students can utilise BIM in production quidance and control.
Content Content of Building information model. BIM utilization in cost calculation. BIM utilization in production planning. BIM utilization in production guidance and control at the site level.
Recommended optional programme components If necessary, the student advisor will recommend optional programme components for each student based on their individual study plan.
Accomplishment methods Not applicable
Execution methods Not applicable
Materials Not applicable
Literature Not applicable
Evaluation Criteria Not applicable
Evaluation Criteria
Assessment Frameworks Not applicable
Further Information No further information
Responsible persons Not applicable
Links Not applicable

Implementations


Show old implementations
  • 01.01.2024 - 05.05.2024 (TS00BN40-3008 | RYM21SP)
  • 01.01.2024 - 05.05.2024 (TS00BN40-3007 | RYM22KM)
  • 01.08.2024 - 29.12.2024 (TS00BN40-3009 | RYM23KP)
20.5.2024 10:20:43